Thursday, January 13, 2011

HYDRO: India’s Plan 2012 to 2017

 

The status of preparation of DPRs (Detailed Project Report) is monitored on regular basis.Here is the list:

HEPs 2012 to 2017               
As per the studies carried out by CEA (Central Electricity Authority) to meet the all India peak demand
and energy requirement at the end of 12th Plan would require a capacity addition of over 90,000 MW in the
5 years period of 2012-17. To achieve the ambitious program a shelf of 146 hydro projects has been identified.
The status of preparation of DPRs (Detailed Project Report) is monitored on regular basis.Here is the list:
Serial No. Name of scheme Type State/Province Agency Installed Benefit in Year of Category*
          Capacity 12th Plan Commissioning  
          (MW)   (Projected)  
                 
1 Bharmour ROR H.P. IPP 45 45 2012-13 A
2 Bara Bhangal ROR H.P. IPP 200 200 2014-15 B
3 Bajoli Holi ROR H.P. IPP 180 180 2012-13 A
4 Chirgaon (Majhgaon) ROR H.P. HPSEB 46 46 2012-13 A
5 Dhaula Sidh ROR H.P. IPP 40 40 2012-13 A
6 Dhamvari Sunda ROR H.P. HPSEB 70 70 2013-14 B1
7 Gharopa ROR H.P. IPP 114 114 2016-17 C
8 Gondhala ROR H.P. IPP 144 144 2015-16 C
9 Harsar ROR H.P. IPP 60 60 2013-14 A
10 Jhangi Thopan ROR H.P. IPP 480 480 2013-14 A
11 Kutehr ROR H.P. IPP 260 260 2013-14 A
12 Khab STO H.P. SJVNL 1020 1020 2016-17 C
13 Kashang-II ROR H.P. HPSEB 60 60 2012-13 A
14 Khoksar ROR H.P. IPP 90 90 2016-17 C
15 Luhri ROR H.P. SJVNL 770 770 2014-15 A
16 Pudital Lassa STO H.P. IPP 36 36 2012-13 A
17 Renuka dam STO H.P. HPSEB 40 40 2016-17 B1
18 Sainj ROR H.P. HPSEB 100 100 2012-13 A
19 Tidong-II ROR H.P. IPP 70 70 2012-13 A
20 Thopan Powari ROR H.P. IPP 480 480 2013-14 A
21 Yangthang Khab STO H.P. IPP 261 261 2016-17 B
22 Kashang – I & III ROR H.P. HPJVVNL 195 195 2013-14 A
23 Shongtong Karcham ROR H.P. HPSEB 402 402 2013-14 A
24 Baglihar-II ROR J & K PDC 450 450 2012-13 A
25 Bursar STO J & K NHPC 1500 1500 2016-17 B
26 Kiru ROR J & K To be decided 600 600 2016-17 B1
27 Kirthai-I ROR J & K PDC 240 240 2016-17 B
28 Kirthai-II ROR J & K PDC 990 990 2016-17 B
29 Kishan Ganga STO J & K NHPC 330 330 2016-17 A
30 Kawar ROR J & K To be decided 520 520 2016-17 B1
31 Lower Kalnai ROR J & K PDC 50 50 2013-14 B
32 New Ganderbal ROR J & K PDC 90 90 2013-14 B
33 Parnai ROR J & K PDC 37.5 37.5 2012-13 A
34 Pakhal Dul STO J & K NHPC 1000 1000 2013-14 B1
35 Parkhachik Panikar ROR J & K PDC 60 60 2013-14 B
36 Ratle ROR J & K To be decided 690 690 2015-16 B1
37 Sonamarg STO J & K PDC 165 165 2015-16 B
38 Sawalkot ROR J & K PDC 1200 1200 2016-17 B1
39 Arkot Tiuni ROR Uttaranchal UJVNL 70 70 2015-16 A
40 Alaknanda (Badrinath) ROR Uttaranchal IPP 140 140 2013-14 A
41 Bogadiyar Sirkari ROR Uttaranchal IPP 170 170 2012-13 A
42 Mapang Bogudiyar ROR Uttaranchal IPP 200 200 2012-13 A
43 Bokang Baling ROR Uttaranchal THDC 330 330 2015-16 C
44 Bowala Nand Prayag ROR Uttaranchal UJVNL 132 132 2013-14 A
45 Chhunger Chal ROR Uttaranchal NHPC 240 240 2013-14 C
46 Deodi ROR Uttaranchal IPP 60 60 2013-14 B
47 Devsari Dam ROR Uttaranchal SJVNL 690 690 2016-17 A
48 Gohana Tal STO Uttaranchal IPP 60 60 2013-14 B
49 Hanol Tiuni ROR Uttaranchal IPP 42 42 2012-13 A
50 Jakhol Sankari ROR Uttaranchal SJVNL 33 33 2012-13 A
51 Jelam Tamak ROR Uttaranchal THDC 60 60 2012-13 A
52 Jadh Ganga ROR Uttaranchal THDC 50 50 2014-15 C
53 Kishau Dam STO Uttaranchal THDC 600 600 2014-15 C
54 Karmoli ROR Uttaranchal THDC 140 140 2014-15 C
55 Karmoli Lumti Talli ROR Uttaranchal NHPC 55 55 2012-13 C
56 Lakhwar STO Uttaranchal NHPC 300 300 2012-13 A
57 Maleri Jhelam ROR Uttaranchal THDC 55 55 201415 A
58 Mori Hanol ROR Uttaranchal IPP 60 60 2012-13 A
59 Nand Prayag Lingasu ROR Uttaranchal UJVNL 141 141 2013-14 A
60 Naitwar Mori (Dewra Mori) ROR Uttaranchal SJVNL 33 33 2013-14 A
61 Pala Tiloth St-I ROR Uttaranchal UJVNL 105 105 2013-14 B
62 Pala Maneri ROR Uttaranchal UJVNL 480 480 2013-14 A
63 Rupsiyabagar Khasiyabara ROR Uttaranchal NTPC 260 260 2013-14 A
64 Sela Urthing ROR Uttaranchal UJVNL 230 230 2016-17 B
65 Sirkari Bhyal Rupsiabagar ROR Uttaranchal UJVNL 210 210 2013-14 A
66 Singoli Bhatwari ROR Uttaranchal IPP 60 60 2012-13 A
67 Tamak Lata ROR Uttaranchal UJVNL 280 280 2014-15 A
68 Taluka Sankri ROR Uttaranchal UJVNL 140 140 2015-16 A
69 Tuini Plasu ROR Uttaranchal UJVNL 42 42 2014-15 A
70 Urthing Sobla ROR Uttaranchal IPP 280 280 2016-17 B
71 Garba Tawa ghat ROR Uttaranchal NHPC 630 630 2015-16 C
72 Dhauli Ganga Intermediate ROR Uttaranchal NHPC 210 210 2013-14 A
73 Gauri Ganga St III-A ROR Uttaranchal NHPC 120 120 2013-14 A
74 Shahpur Kandi STO Punjab PSEB 168 168 2012-13 A
75 Bodhghat STO Chhattisgad CSEB 500 500 2013—14 C
76 Matnar ROR Chhattisgad CSEB 60 60 2013—14 B1
77 Dummugudem STO A..P. APID 320 320 2015-16 A
78 Pollavaram MPP STO A..P. APID 960 960 2014-15 A
79 Chinnar ROR Kerala KSEB 28 28 2012-13 A
80 Pambar ROR Kerala KSEB 40 40 2012—13 B
81 Achenkovil STO Kerala KSEB 30 30 2012-13 A
82 Kundah PSS PSS Tamil Nadu TNEB 500 500 2012-13 A
83 Gundia ROR Karnataka KPCL 400 400 2012-13 A
84 Balimela DPH STO Orissa IPP 60 60 2012-13 B
85 Sindol STO Orissa OHPC 300 300 2016-17 B
86 Ramam St-I ROR W. B. WBSEB 36 36 2012-13 A
87 Panan ROR Sikkim IPP 280 280 2012-13 A
88 Dikchu ROR Sikkim IPP 96 96 2012-13 A
89 Rolep ROR Sikkim IPP 60 60 2012-13 A
90 Rangit-II ROR Sikkim IPP 60 60 2012-13 A
91 Rangit-IV ROR Sikkim IPP 120 120 2012-13 A
92 Lachen ROR Sikkim NHPC 210 210 2014-15 A
93 Rangyong ROR Sikkim IPP 80 80 2012-13 A
94 Rukel ROR Sikkim IPP 33 33 2013-14 A
95 Lingza ROR Sikkim IPP 120 120 2015-16 C
96 Rongnichu STO Sikkim IPP 96 96 2013-14 A
97 Talem ROR Sikkim IPP 75 75 2015-16 C
98 Teesta St.-I ROR Sikkim IPP 280 280 2014-14 A
99 Teesta St.-II ROR Sikkim IPP 480 480 2012-13 A
100 Teesta St.-IV ROR Sikkim NHPC 495 495 2013-14 A
101 Teesta-VI ROR Sikkim IPP 500 500 2013-14 A
102 Ranganadi-II STO Ar. P NEEPCO 130 130 2013-14 B
103 Siang Middle (Siyom) STO Ar. P IPP 1000 1000 2014-15 B1
104 Dibbin ROR Ar. P To be decided 100 100 2012-13 A
105 Badao ROR Ar. P To be decided 60 60 2012-13 A
106 Kapak Leyak ROR Ar. P To be decided 160 160 2012-13 A
107 Talong ROR Ar. P IPP 160 160 2012-13 A
108 Etalin STO Ar. P NTPC 4000 4000 2016-17 A
109 Attunli ROR Ar. P NTPC 500 500 2016-17 A
110 Naying ROR Ar. P IPP 1000 1000 2016-17 C
111 Tato-II ROR Ar. P IPP 700 700 2014-15 B
112 Hirong ROR Ar. P IPP 500 500 2014-15 B
113 Demwe STO Ar. P To be decided 3000 3000 2016-17 B
114 Hutong-II ROR Ar. P IPP 1250 1250 2015-16 B
115 Kalai-I ROR Ar. P IPP 1450 1450 2016-17 B
116 Siang Lower STO Ar. P IPP 1600 1600 2016-17 B1
117 Kameng Dam STO Ar. P IPP 600 600 2016-17 C
118 Kameng-I(Bhareli Lift Dam-I) ROR Ar. P NEEPCO 1120 1120 2014-15 B
119 Kameng-II ROR Ar. P IPP 600 600 2015-16 B
  (Bhareli Lift Dam-II)              
120 Nyamjunchhu St-I ROR Ar. P IPP 98 98 2012-13 A
121 Nyamjunchhu St-II ROR Ar. P IPP 97 97 2012-13 A
122 Nyamjunchhu St-III ROR Ar. P IPP 95 95 2012-13 A
123 Dibang (Joint venture) STO Ar. P NHPC JV 3000 3000 2015-16 A
124 Tawang-II STO Ar. P NHPC 750 750 2015-16 A
125 Tawang-I STO Ar. P NHPC 750 750 2015-16 A
126 Lohit STO Ar. P To be decided 3000 3000 2014-15 B1
127 Subansiri Upper STO Ar. P NHPC 2000 2000 2016-17 B1
128 Subansiri Middle STO Ar. P NHPC 1600 1600 2016-17 B1
129 Lower Kopili ROR Assam AGENCO 150 150 2013-14 A
130 Upper Borpani ROR Assam AGENCO 60 60 2013-14 A
131 Tipaimukh STO Manipur NEEPCO 1500 1500 2015-16 A
132 Loktak d/s ROR Manipur NHPC 66 66 2014-15 B
133 Bairabi STO Mizoram PDD 80 80 2012-13 C
134 Turial STO Mizoram NEEPCO 60 60 2012-13 C
135 Umiam Umtru-V ROR Meghalaya MeSEB 36 36 2012-13 A
136 Ganol ROR Meghalaya MeSEB 25 25 2012-13 A
137 Mawhu ROR Meghalaya NEEPCO 120 120 2012-13 A
138 Nongkolait ROR Meghalaya MeSEB 120 120 2013-14 B
139 Nongnaw ROR Meghalaya MeSEB 50 50 2014-15 B
140 Rangmaw ROR Meghalaya MeSEB 65 65 2014-15 B
141 Umangot STO Meghalaya MeSEB 260 260 2016-17 B
142 Umduna ROR Meghalaya MeSEB 57 57 2016-17 B
143 Myntdu Leshka-II ROR Meghalaya MeSEB 60 60 2016-17 B
144 Selim STO Meghalaya MeSEB 170 170 2016-17 B
145 Umangi Storage-I STO Meghalaya MeSEB 54 54 2015-16 B
146 Mawblei STO Meghalaya MeSEB 140 140 2016-17 C
            58573.5    