he scope of work shall include design of Pelton runners through reverse Engineering process manufacture, supply & transportation, comprehensive insurance ,erection ,testing and commissioning for the Bhaba HEP (3x40 MW) of HPSEB to achieve the output/efficiencies of the existing plant or improved one and handing over to the Board as per following details
Vertical shaft Pelton Turbine, two jet, Single Runner ,output of 41240 KW (55282HP) with 500 rpm under a rated head of 887.20 meter , suitable for direct coupling vertical shaft A.C. Generator.
No comments:
Post a Comment